As explained last year, we live in a college town, and our calendar works just a bit differently than the lunar year. Our "new year" starts in September, when the school year starts. So, I'm much more inclined to reflect on my year now rather than in January.
First, my list of what we have accomplished:
1. Yardwork- I finished planting shrubs and other plants on the slope on the east side of our house. This included installing a drip system and barking it. I have to say it looks great and I'm very proud of myself! I also seeded the lawn and we now have grass. Our yard is starting to shape up!
2. House projects- Todd built shelves in Eric's room. We also painted his walls. I finally got around to staining/waterproofing the rails on the deck. I painted both bathrooms and put new decor in one.
3. Basement- we've made A LOT of progress here, thanks to our decision to hire someone to drywall and tape. We painted the walls (I wish I would've taken a picture; I looked like a ghost after using the sprayer, and according to my hair stylist, I STILL have paint in my hair! ha ha) The electrical is almost done- we have all the outlets and most of the lights installed. The flooring in my craft room, Todd's future office, the closet below the stairs, and the bathroom is installed. Todd is starting to cut boards for the window jam extensions.
Things to Do:
1. Yardwork- I have a ton more plants to plant. The neighbors just graded their yard and all their edging is in, so I can work on planting on that side next spring. I need to plant shrubs in front of the porch (hopefully this fall). I need to add steps to the front porch. Yes, I'm ashamed to say, we have a "Path to Nowhere." But, it somehow seems fitting in this election season :o) A couple of little but importanst project involve adding more gravel to our side driveway, and putting edging around our tree so I can plant tulips. Most of the work will wait until next spring.
Projects around the house: Next winter, we told Sarah we would re-do her room. I have some major cleaning projects (cleaning out cabinets, organize junk drawers) but otherswise we don't have a lot to do that's not related to the basement. Todd wants to eventually add railing to the front porch; perhaps it will get done this year.
Basement- This will be a long-term project, but this year, we will finish installing flooring and move things downstairs to turn it into liveable space. We need to finish the electrical (we're hiring the electrician to install three way light switches and dimmers, cable and phone, and smoke detectors). Todd will once again put his shelf-making ability to good use, as we have A LOT of book shelves to install. And of course, all the trim work, doors, etc need to be done. That may have to wait until late 2009 or even 2010.
I wonder when or if our "things to do" list will be shorter than the "things we've done" one.
No comments:
Post a Comment